Project Overview
This customer has a highly critical manufacturing process where tightly controlling enviromental conditions is vital to production. They needed a boiler system that would be able to complete their process without contaminating the environment.
Equipment Selected
Steam Skid w/ (2) CFH 25HP Steam Boilers w/ Feedwater skid, water softener and unfired steam generator.
Solution & Results
D. J. Conley recommending using two CFH 25HP units to meet their load requirement but can also provide “Steam” to an unfired steam generator that was being feed deionized water. This allowed the customer to maintain a ‘clean’ enviroment using the efficiency of the Clearfire Steam Boiler.
Completion Date
2018
Project Engineer
Patrick Michels
Authored By
Patrick Michels