Project Overview

Central Energy Steam Boiler Replacement/Upgrade

This customer had a need to replace existing 50+ year old industrial watertube boilers with new – in addition to low NOx burners & PLC based controls.

Equipment Selected

Three (3) Cleaver-Brooks Model NB-300D-70, 90,000 PPH each at 250 PSI design & 175 PSI operating pressure

Solution & Results

All three (3) boilers delivered on-time; project installed, started, and system fully commissioned within schedule. Low NOx levels exceed expectations. The owner was pleased with overall project outcome. 

Completion Date

2018

Project Management

Sales Engineer: Mike Conley
Project Engineer: Brian Frank