Project Overview
A pharmaceutical plant in Rochester Michigan recently commissioned Johnson Controls, Inc. (JCI) to furnish & install new steam boilers for its facility to replace outdated, inefficient boilers.
Equipment Selected
Three 500 hp Cleaver-Brooks High Pressure Steam Boilers, Hawk PLC Control System
Solution & Results
It was their recommendation that three new 500 horsepower Cleaver-Brooks high-pressure steam boilers be selected for their robust nature, technologically advanced & integrated Hawk PLC-based control system. The controls include parallel positioning, 02 trim and VSD with bypass along with the ADAC (Advanced Deaerator Control) which integrates the Deaerator functionality of feedwater and level control with boiler operation for a total integrated solution.
Completion Date
2019
Project Management
Aaron Miller
Authored By
Mike Conley